Q&A

How much does it cost to build a 1 floor house in Bangalore?

How much does it cost to build a 1 floor house in Bangalore?

The BBMP plan approval cost for a ground floor, G+1 floor house in Bangalore ranges from 80k to 1 lakh. For G+2 and G+3 level houses, it goes up to 2.5 to 3 lakhs, and for G+4 level construction, it can go up to 3 to 5 lakhs.

How much does it cost to build a 1 floor house?

The average construction cost of a 1,000 sq ft home may vary from about Rs 1,300 per sq ft to Rs 5,000 per sq ft.

How much does it cost to build a 3 bedroom house in Bangalore?

The Scenario House Construction Cost in Bangalore As of Now May 2021

READ:   Who is the greatest day trader of all time?
Sl No Plot Dimension Cost of Constructions – At Rs 1800 Per Sqft (Post Covid Impact)
1 30 by 40 Feet (1200 Sqft) 17.7 Lakhs
2 30 by 40 Feet (1200 Sqft) 35.5 Lakhs
3 30 by 40 Feet (1200 Sqft) 53.3 Lakhs
4 30 by 40 Feet (1200 Sqft) 71.1 Lakhs

What is the minimum budget to build a house?

The construction cost can be taken approximately as Rs 500 per sq. ft of plinth area of your home. Assuming that you are planning to buy a ground of land at Rs 6 lakhs and build a house of 1200 sq ft, the total cost of the building is about Rs 12 lakhs. Add 20 \% on this towards miscellaneous and unforeseen expenses.

What is the minimum cost to build a house?

The construction cost can be taken approximately as Rs 500 per sq. ft of plinth area of your home. Assuming that you are planning to buy a ground of land at Rs 6 lakhs and build a house of 1200 sq ft, the total cost of the building is about Rs 12 lakhs.

READ:   Do pediatricians need a certifications?

What is the cost of construction in Bangalore for a house?

The current construction cost in Bangalore varies from Rs 1500 to Rs 1900 / sq ft for a structure may it be residential or commercial, has a difference in rates as there can be a change in materials used and its planning. Architects fix the cost of construction in Bangalore for a particular building after analyzing various factors.

How much does it cost to build a commercial building in India?

For commercial construction (Offices, Hotels, IT Buildings etc.) it will be around Rs.2400 per square feet (BUA) to Rs.2800 per square feet and will include structure cost, MEP services, HVAC, Fire fighting services and FAPA system.

How much does it cost to build a rental house in India?

RENTAL HOUSES G+4 / G+3 / G+2 Floors Build Cost : Rs 27 to Rs 37 lacs: It’s always advisable to have or provide the entire ground floor for parking if building rental houses on 20×60 / 600 sq ft land.

READ:   Can I lose weight by jogging 20 minutes a day?

How much does it cost to build a house in Sarjapur?

Site Cost: Rs 90 lacs (Considering Sites at Sarjapur Anekal Road). Building Cost: 60 lacs (3700 sq ft excluding parking). Ground Floor: 2 Car parking spaces with good landscape gardens along with small play areas. House 1: 2000 sq ft : Ground Floor 2BHK and House 2 : 2300 sqft: Second Floor 2 Bhk with Balconies wherever required.